Describe: Main objectives of the pilot, Estimated duration of the pilot, Required operational conditions, Input requirements, Volume, chemical composition, solid/matrices, necessary utilities, Handling and safety considerations
Ex: Controlled and modular pilot units connected to INLiSa's brine management systems, Controlled and modular pilot units connected to INLiSa's brine management systems, Analytical laboratories and quality control services, Technical assistance and monitoring protocols, Shared infrastructure and utilities (energy, water, process data acquisition systems), Digital integration for data management, performance benchmarking and reporting, Support for regulatory compliance, or Other, Equipment / instrumentation / personnel needed, Intellectual property considerations / black boxes, Collaboration or consortium needs
Data or information that could be shared, Local collaboration opportunities, Potential contributions, Donation or loan of equipment